Photo Gallery

Replacement of Fabric Expansion Joints, SWEC-IWPP, Shuaibah-Jeddah (2013 – 2014)

Installation of Mechanical Equipment, Ma’aden Goldmine , Al-Amar (2017)

Upgradation of Floatation cells and Mill Enhancement, Phase-2 Modification, Ma’aden Goldmine , Al-Amar (2018)

Installation of Pumps, Dosing units, Electrical and Instrumentation, Ma’aden Goldmine , Al-Amar (2017)

Co2 Piping, SS piping, Structural works, GRP lamination and piping – Shoaibah III Desalination Plant Expansion II (2019)

Fire Fighting and Water Supply Main Piping works – Sharorah Plant (2012)

Stainless Steel Piping Works – Shuaibah III Expn II Diesel Plant (2019)

Co2 Piping / Structural Works – Shuaibah III Expn II Diesel Plant (2019)

Co2 Piping / Tanks Works – Shuaibah III Expn II Diesel Plant (2019)

Structural Works / Ducting – Shuaibah III Expn II Diesel Plant (2019)

AHU Duct Connection Works – KAUST Project Tuwal (2008)

MEP Network Installation Works – KAUST Project Tuwal (2008)

Furnace Modification Structural Works – OUTOTEC / CRISTAL-AMIC JIZAN (2019)

Structural Works – OUTOTEC / CRISTAL-AMIC JIZAN (2019)

GRP Piping works – Rabigh Power Plant (2012-2013)

GRP Piping works – Marafiq /SETE IWTP-II Project Yanbu-2013